Skip to Content

References

Latest projects

First in the EU: smart water purification

Due to increasing water stress and stricter sustainability goals, a groundbreaking project was realized in Hofstade. The aim was to directly convert treated urban wastewater into safe drinking water. This project had to meet the strictest drinking water standards while also ensuring continuous and reliable operation. WPC Hofstade became the first operational Direct Potable Reuse facility in Europe.

Read more -->

Textile plant PLC upgrade

For a textile manufacturer, Centif modernized the machinery with the latest PLC and HMI technology (WinCC Unified). At the same time, an important step was taken in OT security by segmenting the network using Ixon.

Read more -->

 

Validated process control (cGMP)

Centif was asked to provide support in the area of software. This ranges from PLC (Siemens), HMI/SCADA (iFIX), Batch (Proficy®) to the development of virtual server environments. There is a strong focus on 21 CFR part 11 and GMP compliance. 

Read more --> 

Arop: restoring process reliability

What if an expensive automation machine fails and puts production under pressure? At Arop in Wilrijk, this became a reality. Centif redirected the process towards a stable and high-performing installation. In this article, you will discover the approach and gain insights from the project manager/technical responsible person.

Read more -->

 

GMP-critical PLC migration

For an international pharmaceutical player, Centif modernized the automation infrastructure of an entire building. The outdated Siemens S5 system was replaced with a future-oriented Siemens S7 platform to improve reliability and maintenance.

Read more -->

24/7 Service Level Agreement

Door te kiezen voor een structureel Service Level Agreement met Centif beschikt de klant over snelle technische ondersteuning, proactief systeembeheer en geborgde expertise. Zo blijft de productie maximaal beschikbaar, worden risico's beperkt en kan de organisatie rekenen op een betrouwbare engineeringpartner zonder extra interne capaciteit te moeten opbouwen.

Lees meer -->